Peugeot 406

Since 1996 of release

Repair and car operation



Peugeot 406
+ 1. The maintenance instruction
+ 2. Maintenance service
+ 3. The engine
+ 4. Systems of cooling, heating and ventilation
- 5. Fuel system
   + 5.1. The power supply system of petrol engines
   - 5.2. Fuel system of diesel engines
      5.2.1. Technical data
      5.2.2. Filling and prorolling of fuel system
      5.2.3. The air filter and air inlet channels
      5.2.4. An accelerator cable
      5.2.5. An accelerator pedal
      5.2.6. Adjustment of the fuel pump of a high pressure
      5.2.7. The electromagnetic valve of a stop of the engine
      5.2.8. The fuel pump of high pressure Bosch
      5.2.9. The fuel pump of high pressure Lucas
      5.2.10. Installation of the moment of injection
      5.2.11. Installation of the moment of injection on ТНВД Bosch
      5.2.12. Installation of the moment of injection on ТНВД Lucas
      5.2.13. Fuel atomizers
      5.2.14. Gauges and executive mechanisms of system Bosch AS3
      5.2.15. Gauges and executive mechanisms (Lucas EPIC)
      5.2.16. An inlet collector
      5.2.17. A final collector
      5.2.18. Турбонагнетатель
      5.2.19. Removal and installation турбонагнетателя
      5.2.20. Check турбонагнетателя
      5.2.21. An intermediate cooler
+ 6. Ignition system
+ 7. Coupling
+ 8. Transmissions
+ 9. Power shafts
+ 10. Brake system
+ 11. A suspension bracket and a steering
+ 12. A body
+ 13. An electric equipment
+ 14. The basic malfunctions



5.2.12. Installation of the moment of injection on ТНВД Lucas
THE GENERAL DATA

The prevention

Be cautious, that the dirt has not got to the fuel pump or the high pressure pipeline at work on the fuel pump. Also always it is necessary to use new consolidation.


Removal

PERFORMANCE ORDER
1. Disconnect the negative plug of the accumulator.
2. Remove the electronic control device of system of injection of fuel (ECU) and block ECU box.
3. Remove system of inlet pipes and the top part of an inlet collector.
4. Remove auxiliary приводной a belt.
5. Remove the alternating current generator.
6. Unscrew bolts and remove an intermediate arm (the pump of the amplifier of a steering and the generator) sideways the block of cylinders.
7. Unscrew bolts of fastening of a plait of wires to the engine and move a fixing element aside from the fuel pump. Probably, it is necessary to disconnect some electric sockets to move a plait of wires on sufficient distance. Mark all disconnected sockets.
8. Remove a casing of a gear belt of the drive, closing pulley of the fuel pump.
9. Establish the mechanism timing before combination of adjusting apertures, then turn коленвал on a turn quarter counter-clockwise.
10. Unscrew заглушку from an aperture of installation of the moment of the injection, located sideways the fuel pump. In the absence of special adjusting core Peugeot it is possible to use a short core in diameter of 1.5 mm, which one end конусный.
11. Insert core Peugeot into an aperture of installation of the moment of injection sideways the fuel pump. Slightly having pressed on a core, slowly turn коленвал in a direction of its working rotation before installation of core Peugeot in a groove in the internal mechanism of the pump.
12. Remove all tools and establish коленвал in position of combination of adjusting apertures then turn коленвал on a turn quarter.
13. Insert core Peugeot into an aperture of installation of the moment of injection sideways the fuel pump. Slightly having pressed on a core, slowly turn коленвал in a direction of its working rotation before installation of core Peugeot in a groove in the internal mechanism of the pump. In this position the mechanism timing is in installation position, and blocking cores should be established in engine pulleys.
14. If it is necessary to make adjustment, take an adjusting core from the pump, turn коленвал in position of installation and block pulleys blocking cores. Ослабьте forward and back bolts of fastening of the pump also move the pump from the engine. Insert a core of installation Peugeot into an aperture of installation of the moment of injection sideways the pump, press core Peugeot and slowly turn the fuel pump to the engine while core Peugeot will not enter into a groove of the internal mechanism of the pump.
15. Screw up nuts and bolts of fastening of the pump the demanded moment.
16. Remove a core of installation Peugeot and close an aperture заглушкой.
17. Remove a blocking core коленвала.
18. Establish all earlier removed knots and details.